news-image

Royal visit to Shrewsbury facility

13th January 2017

Weedon Architects are proud to have acted as design development Architects for the Battlefield Energy Recovery Facility in Shrewsbury, Shropshire which was formally opened by The Princess Royal last week.

The site has been built with the latest recovery technology to help transform residents’ residual waste into a resource. The facility processes 90,000 tonnes of non-recyclable household waste from across the county generating 8MW of low carbon energy, enough to power 10,000 homes via the National Grid.

The Battlefield project is the second Energy from Waste Facility since 2011 we have delivered with a further two more currently on site.



back