Weedon Architects have been appointed to produce planning drawings for both NMA and Section 73 applications for Enfinium in conjunction with HZI.
Following appointment to carry out a high-level concept review of the proposed scheme and input into the building form, proposed materials and re-design of the Admin Block layout and subsequent presentation to Enfinium, Weedons were appointed to produce planning drawings and visuals for both the Non-Material Amendment and Section 73 submission.
Non-Material Amendment was approved in April 2021. The facility will provide sustainable disposal of 410,000 tonnes of residual waste per year and will generate 41 megawatts of low carbon energy.
The project construction is due for commencement in June 2022 and contains significant ground remediation works.